Manhattan NYC +Unstable Building+ 201 East 57th St. Div 3 repots approximately 4 tons of concrete was poured through a wall of a 5 story building under construction and its going thru the wall which is unstable, 100 people evacuated from the adjacent 6 story 50×100 building. requesting R-3 and the Collapse Unit.
Join our WhatsApp groupSubscribe to our Daily Roundup Email